Skip to main content
Digital Archive Toronto Public Library Homepage
curving Roof of the velodrome being built Montreal for the Olympic Games is near the main stadium, which was planned to have a parachute-style plastic(...)
curving Roof of the velodrome being built Montreal for the Olympic Games is near the main stadium, which was planned to have a parachute-style plastic(...)

curving Roof of the velodrome being built Montreal for the Olympic Games is near the main stadium, which was planned to have a parachute-style plastic(...)

Date12/12/1974
Names
(photographer)
Format
Notes
Original Toronto Star caption: curving Roof of the velodrome being built Montreal for the Olympic Games is near the main stadium; which was planned to have a parachute-style plastic dome. Architects speculate that soaring costs of construction will force elimination of the dome-cutting the season for the stadium and the money it takes in.
Language
ProvenanceFrom the Toronto Star Archives
Usage Rights Copyright (Learn More)
Copyright HolderToronto Star (Firm)
Call Number / Accession NumberTSPA_0096781F