Skip to main content
Digital Archive Toronto Public Library Homepage
The new subway's a big bore. Two 75-ton boring machine are ready at Spadina Rd. and Davenport Rd. to be lowered into the ground and pushed along as th(...)
The new subway's a big bore. Two 75-ton boring machine are ready at Spadina Rd. and Davenport Rd. to be lowered into the ground and pushed along as th(...)

The new subway's a big bore. Two 75-ton boring machine are ready at Spadina Rd. and Davenport Rd. to be lowered into the ground and pushed along as th(...)

Date1/20/1975
Format
Notes
Original Toronto Star caption: The new subway's a big bore. Two 75-ton boring machine are ready at Spadina Rd. and Davenport Rd. to be lowered into the ground and pushed along as the tunnel progresses under Casa Loma for the Spadina subway. The machine shield the men working in the tunnel and eliminate the need for shoring up at the work face. Subway is to open in 1977.
Subject
Language
ProvenanceFrom the Toronto Star Archives
Usage Rights Copyright (Learn More)
Copyright HolderToronto Star (Firm)
Call Number / Accession NumberTSPA_0115690F