Skip to main content
Digital Archive Toronto Public Library Homepage
With a generating capacity of 480,000 horsepower, the huge Des Joachims development on the Ottawa river is designed to turn southern Ontario into a po(...)
With a generating capacity of 480,000 horsepower, the huge Des Joachims development on the Ottawa river is designed to turn southern Ontario into a po(...)

With a generating capacity of 480,000 horsepower, the huge Des Joachims development on the Ottawa river is designed to turn southern Ontario into a po(...)

Date9/18/1948
Names
(photographer)
Format
Notes
Original Toronto Star caption: With a generating capacity of 480;000 horsepower; the huge Des Joachims development on the Ottawa river is designed to turn southern Ontario into a power-prosperous area by 1951; Right; two workers in action. Below; a dam under construction at Des Joachims.
Subject
Language
ProvenanceFrom the Toronto Star Archives
Usage Rights Public Domain (Learn More)
Call Number / Accession NumberTSPA_0116521F