Skip to main content
Digital Archive Toronto Public Library Homepage
The steel skeleton of Malton's second passenger terminal is slowly rising to the east of the present terminal
The steel skeleton of Malton's second passenger terminal is slowly rising to the east of the present terminal

The steel skeleton of Malton's second passenger terminal is slowly rising to the east of the present terminal

Date11/20/1970
Names
(photographer)
Format
Notes
Original Toronto Star caption: The steel skeleton of Malton's second passenger terminal is slowly rising to the east of the present terminal. Terminal Two, as it is unofficially known, has been designed to handle the jumbo jet which is expected to make its apperance at Malton next April. However, the new terminal won't be ready until the end of 1972, according to estimate by Airport Manager Ron Harris. In the meantime, arrangements will be made at the existing, overtaxed terminal to handle the big birds.
Language
ProvenanceFrom the Toronto Star Archives
Usage Rights Copyright (Learn More)
Copyright HolderToronto Star (Firm)
Call Number / Accession NumberTSPA_0003227F
Country:Canada
City, town or township:Toronto
Province or state:Ontario